City of Calgary Bridge Case Study

Project Overview

City of Calgary +15 Bridge Envelope Project

The City of Calgary Bridge project involved building envelope work on a +15 pedestrian bridge within Calgary’s elevated walkway network. Our team completed exterior cladding work with a focus on weather protection, durability, and maintaining a clean, consistent finish suitable for a heavily used public structure.

The completed work helps protect the bridge structure from Calgary’s changing weather conditions while supporting the long-term performance of its exterior envelope. Careful installation and detailing provided a durable finished system suited to the demands of a public infrastructure project.

Project Gallery

Project Highlights

Durable Exterior Protection for Public Infrastructure

Public building envelope projects require materials and installation methods capable of handling continuous exposure to wind, moisture, snow, and significant seasonal temperature changes. For the City of Calgary +15 Bridge project, our team focused on completing the cladding work with consistent detailing and dependable weather protection throughout the structure.

The completed exterior system helps shield the underlying structure from the elements while providing a clean and consistent finish. The project demonstrates our ability to complete specialized exterior work on institutional and community infrastructure where durability, workmanship, and long-term performance are key priorities.

Planning an Institutional or Community Project?

Straight Path Construction provides professional roofing, cladding, and exterior services for institutional, community, and commercial properties. Contact our team today to discuss your upcoming project and request your free estimate.

Call Us: +1 (825) 558 1829